It's not possible to create a different schedule per lot. The schedule and its description are set in the main tender and leading for all lots linked to this tender.
A participant for example is unable to submit lots at different times. Everything is submitted at the same time, main tender as well as lots.
Do you still want to work with a separate schedule for each lots? Then you have to create separate tenders for each lot.