Unfortunately, that is not possible

The planning that is listed under the main tender will be leading and is assigned to all lots linked to your tender.

It is not possible for a vendor to submit different lot at different times. Everything is submitted simultaneously, both the main tender as well as the lots.

Do you still want to work with a separate planning for each lots? Then you have to create separate tenders for each lot.